Machine Timings

With your map built the next critical step in configuring your LMS is timing your machine.

Machine timings are divided into horizontal and vertical.

For horizontal timings our methodology is to set up a standard race track, run multiple tests per piece of equipment, and determine both the equipment loaded speed, unloaded speed, acceleration and deceleration.

For vertical timing our methodology is to time both obtain and place at each level used by the warehouse.

Whether validating current machine times or doing an initial machine timing 4SIGHT engineers use our methodology involving vehicle operators in clearly defined scenarios. 4SIGHTS approach supports the overall Change Management approach that emphasizes multiple operator involvement.